How much is the budget for the decoration price of

2022-07-22
  • Detail

Project 1: Foundation Engineering

wall chipping (gypsum ash) 384.00

wall blank base treatment 192.00

attic, stair 4500.00

project 2: Waterway and circuit engineering

strong and weak current construction (lump sum price) 3000.00

waterway construction (lump sum price) 1550.00

change sewer 74.00

change sewer 189.00

太原性病医院

上海整形医院

郑州不孕不育医院

Copyright © 2011 JIN SHI